25kW Eco Angus Orligno 200 Log Gasification Boiler

Date: Spring 2014 Installation: – 25kW Eco Angus Orligno 200 Log Gasification Boiler – Under-floor heating – Mechanical Ventilation with Heat Recovery – Rainwater Harvesting System – Two Bathrooms – Electrical works Project details: David contacted us when designing his new family home in Murrow, Cambridgeshire. David had viewed our website and was keen to use…

OkoFEN-Biomass-Boiler-Installation-Ely-Cambs-Eco-Installer

20kW Biomass Boiler & 4,463kWh Solar Installation, Ely

Period: Winter 2014 Installation: –  20kW OkoFEN Pellematic Biomass Boiler and Pellet Silo –  6kW Solar PV –  Aarow Insert Wood-burner Project details: When working on a solar installation in Haddenham, our customer’s Father, Trevor visited the property to find out more. He had an interest in renewable heating and solar energy but didn’t want…

Eco-Installer-Warmflow-Cambridge

18kW Warmflow Biomass Boiler, Cambridge

Period: Summer 2015 Installation: 18kW Warmflow Biomass Boiler Payback: 5 Years Project details: Andrew and Kathryn’s recent Energy Performance Certificate (EPC) indicated that their current heating system was not very energy efficient. The under sized existing electric boiler wasn’t meeting the family’s heating and hot water requirements. As the house wasn’t being heated properly, there…

warmflow-pellet-boiler-Eco-Installer-Ely

18kW Warmflow Biomass Boiler, Waterbeach, Ely

Period: Winter 2014 Installation: 18kW Warmflow Biomass Boiler Payback period: 3 Years Renewable Heat Incentive Payments: Approximately £4,100 per year Mr Young’s boiler had broken and he needed a replacement quickly. With a young family he was keen to consider the environment and preferred a renewable energy system to heat his family home in Waterbeach, Cambridgeshire. Working…

Biomass-boiler-image-eco-installer

OkoFEN Biomass Boiler & Pellet Silo, Swaffham Bulbeck

Period: Autumn 2014 Installation: 20kW OkoFEN Pellematic Biomass Boiler and Pellet Silo Payback period: 4 years Project details: Mr & Mrs Young contacted us with a requirement to replace their ageing Aga which was providing their heating and hot water. The customers were planning improvements for their home in Swaffham Bulbeck and were keen to…