Renovation_Eco_Installer_NIBE_ASHP

Transformation of a Grade 2 Listed Building in to a Home for the 21st Century

Installation: Nibe Air Source Heat Pump Under-floor Heating Bathrooms Panasonic air-to air system Plumbing Work Electrical work Architects: Mole Architects Main contractor: Valliant Location: Holywell, Cambridgeshire Project details: Friars a grade 2 listed building had been unoccupied for several years and was registered ‘at risk’. Working with Mole Architects, our customer obtained planning permission to…

Eco-Angus-Log-Gasification-Boiler-RHI-Eco-Installer-Ely

25kW Eco Angus Orligno 200 Log Gasification Boiler

Date: Spring 2014 Installation: – 25kW Eco Angus Orligno 200 Log Gasification Boiler – Under-floor heating – Mechanical Ventilation with Heat Recovery – Rainwater Harvesting System – Two Bathrooms – Electrical works Project details: David contacted us when designing his new family home in Murrow, Cambridgeshire. David had viewed our website and was keen to use…

UFH-Gas-Boiler-Ely-Eco-Installer

Under-floor Heating and Gas Boiler Installation

Date: Autumn 2015 Installation Details: Vaillant Combi Gas Boiler 824 Ecotec LoPro™Max Under-floor Heating 4kW Colbeck Multi-Fuel Stove Project Details: Paul called our office when looking to upgrading the heating system for his family home. He had a few different options in mind which he wanted to go through with a member of our Sales…

Panasonic-Heat-Pump-Side-House-Eco-Installer-Cambs-web

9kW Panasonic T-Cap Air Source Heat Pump, Waterbeach

Dates: September 2014 – January 2015 Installation: 9kW Panasonic T-Cap Air Source Heat Pump 3kW Solar Photovoltaic (PV) Panels Underfloor Heating Bathrooms Charnwood log burner Project details: Roly worked with local Architect Freeman Brear to specify the design of the new build project in Waterbeach, Cambridgeshire, builders Salmon Brothers, and the homeowner, to build and…